Find out about the latest news and events that could impact your investments.
Data Center Projects | Project West proposes a 1.5 million sq ft technology campus in LaGrange, Georgia Company Not Disclosed, GA | Georgia Department of Community Affairs 2025-03-07 | Metric Name: N/A MWh | Square Feet Area: 1512000 Square Feet | Read more, Project West proposes a 1.5 million sq ft technology campus in LaGrange, Georgia |
Data Center Projects | xAI acquires a 1 million sq ft facility in Whitehaven, Memphis, for data center expansion xAI, TN | Daily Memphian 2025-03-07 | Metric Name: 260 MWh | Square Feet Area: 1000000 Square Feet | Read more, xAI acquires a 1 million sq ft facility in Whitehaven, Memphis, for data center expansion |
Data Center Projects | Developer proposes a $2.1 billion, 17.2 million sq ft data center campus in Archbald, Pennsylvania Company Not Disclosed, PA | The Times- Tribune 2025-03-06 | Metric Name: N/A MWh | Square Feet Area: 17200000 Square Feet | Read more, Developer proposes a $2.1 billion, 17.2 million sq ft data center campus in Archbald, Pennsylvania |
Data Center Projects | Red Wolf DCD Properties proposes a 2.1 million sq ft technology campus in Cordele, Georgia Company Not Disclosed, GA | Georgia Department of Community Affairs 2025-03-06 | Metric Name: N/A MWh | Square Feet Area: 2100000 Square Feet | Read more, Red Wolf DCD Properties proposes a 2.1 million sq ft technology campus in Cordele, Georgia |
Data Center Projects | Nebius partners with DataOne to develop a 300 MW data center in New Jersey, USA DataOne, NJ | Nebius 2025-03-04 | Metric Name: 300 MWh | Square Feet Area: N/A Square Feet | Read more, Nebius partners with DataOne to develop a 300 MW data center in New Jersey, USA |
Manufacturing Projects | TSMC announces a $100 billion investment to expand semiconductor manufacturing in the U.S. TSMC, AZ | CNBC 2025-03-03 | Value: 100 USD - Billions | Square Feet Area: N/A Square Feet | Read more, TSMC announces a $100 billion investment to expand semiconductor manufacturing in the U.S. |
Data Center Projects | Fredericksburg City Council approves a Technology Overlay District, enabling data center development in Celebrate Virginia South STACK Infrastructure, VA | fredericksburgfreepress 2025-02-26 | Metric Name: N/A MWh | Square Feet Area: 2500000 Square Feet | Read more, Fredericksburg City Council approves a Technology Overlay District, enabling data center development in Celebrate Virginia South |
Data Center Projects | Microsoft to build a 2-building data center in Castroville, adding 489,400 sqft to their already planned 2.2 millions sqft in the Texas area Microsoft, TX | Texas Department of Licensing and Regulation 2025-02-25 | Value: 765 USD - Millions | Square Feet Area: 489400 Square Feet | Read more, Microsoft to build a 2-building data center in Castroville, adding 489,400 sqft to their already planned 2.2 millions sqft in the Texas area |
Data Center Projects | PowerHouse and Provident partner to develop a 768-acre hyperscale data center campus in Grand Prairie, Texas Power House Data Centers, TX | Power House Data Centers 2025-02-25 | Power Comsumption: 1800 MWh | Square Feet Area: N/A Square Feet | Read more, PowerHouse and Provident partner to develop a 768-acre hyperscale data center campus in Grand Prairie, Texas |
Manufacturing Projects | Apple announces a $500 billion U.S. investment, including a new 250,000 sq ft AI server manufacturing facility in Houston, Texas and Data Center expansion on current portfolio Apple, TX | CNBC 2025-02-24 | Value: 500 USD - Billions | Square Feet Area: 250000 Square Feet | Read more, Apple announces a $500 billion U.S. investment, including a new 250,000 sq ft AI server manufacturing facility in Houston, Texas and Data Center expansion on current portfolio |
Data Center Projects | Aligned Data Centers invests $120.5 million in a 429,603 sq ft facility in Mansfield, Texas Aligned Data Centers, TX | Aligned Data Centers 2025-02-19 | Metric Name: N/A MWh | Square Feet Area: 429603 Square Feet | Read more, Aligned Data Centers invests $120.5 million in a 429,603 sq ft facility in Mansfield, Texas |
Data Center Projects | Teton Digital receives approval for a 100MW data center in Dry Fork Township, North Dakota Company Not Disclosed, ND | KFYR tv 2025-02-18 | Power Comsumption: 100 MWh | Square Feet Area: N/A Square Feet | Read more, Teton Digital receives approval for a 100MW data center in Dry Fork Township, North Dakota |
Data Center Projects | Microsoft plans two additional data centers in San Antonio, Texas Microsoft , TX | Datacenterdynamics 2025-02-18 | Metric Name: N/A MWh | Square Feet Area: 490000 Square Feet | Read more, Microsoft plans two additional data centers in San Antonio, Texas |
Data Center Projects | Atlas Development proposes a six-building, 2.274 million sq ft data center campus in Bartow County, Georgia Company Not Disclosed, GA | Georgia Department of Community Affairs 2025-02-18 | Metric Name: N/A MWh | Square Feet Area: 2274000 Square Feet | Read more, Atlas Development proposes a six-building, 2.274 million sq ft data center campus in Bartow County, Georgia |
Data Center Projects | Amazon expands its data center operations in Boardman, Oregon, with new land acquisition Amazon AWS, OR | OregonLive 2025-02-16 | Metric Name: N/A MWh | Square Feet Area: N/A Square Feet | Read more, Amazon expands its data center operations in Boardman, Oregon, with new land acquisition |
Data Center Projects | Atlas Development proposes a 2 million sq ft data center campus in Bartow County, Georgia Company Not Disclosed, GA | Bisnow 2025-02-14 | Metric Name: N/A MWh | Square Feet Area: 2274000 Square Feet | Read more, Atlas Development proposes a 2 million sq ft data center campus in Bartow County, Georgia |
Data Center Projects | Stack Infrastructure announces a 144MW data center campus in Loudoun County, Virginia STACK Infrastructure, VA | Globalnewswire 2025-02-11 | Power Comsumption: 144 MWh | Square Feet Area: 1317000 Square Feet | Read more, Stack Infrastructure announces a 144MW data center campus in Loudoun County, Virginia |
Infrastructure Projects | EdgeConneX proposes 120MW gas-fired power plant to support data center in Licking County, Ohio EdgeConneX, OH | Newark Advocate 2025-02-10 | Power Comsumption: 120 MWh | Square Feet Area: N/A Square Feet | Read more, EdgeConneX proposes 120MW gas-fired power plant to support data center in Licking County, Ohio |
Data Center Projects | T5 Data Centers announces a 1.2GW data center campus in Grayslake, Illinois T5 Data Centers, IL | T5 Data Centers 2025-02-07 | Power Comsumption: 1200 MWh | Square Feet Area: 5000000 Square Feet | Read more, T5 Data Centers announces a 1.2GW data center campus in Grayslake, Illinois |
Data Center Projects | Amazon plans a $1 billion data center in Marysville, Ohio, with significant community contributions Amazon AWS, OH | Marysville Journal-Tribune 2025-02-05 | Metric Name: N/A MWh | Square Feet Area: 1000000 Square Feet | Read more, Amazon plans a $1 billion data center in Marysville, Ohio, with significant community contributions |
Data Center Projects | Tract seeks to rezone over 700 acres in Chesterfield County, Virginia, for a data center park Tract, VA | richmondbizsense 2025-02-03 | Metric Name: N/A MWh | Square Feet Area: 2000000 Square Feet | Read more, Tract seeks to rezone over 700 acres in Chesterfield County, Virginia, for a data center park |
Data Center Projects | Proposed data center in Beaver Dam, Wisconsin, raises concerns about significant energy demand Company Not Disclosed, WI | WPR 2025-02-03 | Metric Name: N/A MWh | Square Feet Area: N/A Square Feet | Read more, Proposed data center in Beaver Dam, Wisconsin, raises concerns about significant energy demand |
Data Center Projects | Rezoning request submitted for 391-acre data center project in Morgan County, Indiana Company Not Disclosed, IN | insideindianabusiness 2025-02-03 | Metric Name: N/A MWh | Square Feet Area: N/A Square Feet | Read more, Rezoning request submitted for 391-acre data center project in Morgan County, Indiana |
Data Center Projects | Diode Ventures plans 620-acre data center in Kuna, Idaho, with significant community investments Diode Ventures, ID | boisedev 2025-01-29 | Metric Name: N/A MWh | Square Feet Area: N/A Square Feet | Read more, Diode Ventures plans 620-acre data center in Kuna, Idaho, with significant community investments |
Data Center Projects | Microsoft acquires 240 acres in Kenosha, Wisconsin, for data center development Microsoft, WI | Milwaukee Independent 2025-01-28 | Metric Name: N/A MWh | Square Feet Area: N/A Square Feet | Read more, Microsoft acquires 240 acres in Kenosha, Wisconsin, for data center development |
Data Center Projects | DPO partners with Billerud to develop a $200 million AI data center in Wisconsin Rapids, Wisconsin Digital Power Optimization, Inc, WI | PR news wire 2025-01-23 | Power Comsumption: 20 MWh | Square Feet Area: N/A Square Feet | Read more, DPO partners with Billerud to develop a $200 million AI data center in Wisconsin Rapids, Wisconsin |
Data Center Projects | President Trump announces $500 billion Stargate AI project with OpenAI, Oracle, and SoftBank Oracle , TX | The Guardian 2025-01-21 | Metric Name: N/A MWh | Square Feet Area: N/A Square Feet | Read more, President Trump announces $500 billion Stargate AI project with OpenAI, Oracle, and SoftBank |
Data Center Projects | Ryan Companies shifts from 2 million sq ft industrial plan to $687 million data center in Eloy, Arizona Company Not Disclosed, AZ | azbex 2025-01-21 | Power Comsumption: 400 MWh | Metric Name: 2000000 Square Feet | Read more, Ryan Companies shifts from 2 million sq ft industrial plan to $687 million data center in Eloy, Arizona |
Data Center Projects | Sailfish Digital Ventures plans 5GW data center park spanning 2,600 acres near Dallas-Fort Worth, Texas Company Not Disclosed, TX | Sailfish Digital Ventures 2025-01-21 | Power Comsumption: 5000 MWh | Square Feet Area: N/A Square Feet | Read more, Sailfish Digital Ventures plans 5GW data center park spanning 2,600 acres near Dallas-Fort Worth, Texas |
Data Center Projects | Luzerne County Council's Infrastructure Committee to discuss 15-building, 1,280 acres data center campus in Pennsylvania Company Not Disclosed, PA | The Citizen's Voice 2025-01-19 | Metric Name: N/A MWh | Square Feet Area: N/A Square Feet | Read more, Luzerne County Council's Infrastructure Committee to discuss 15-building, 1,280 acres data center campus in Pennsylvania |
Data Center Projects | TPA Group plans $5 billion, nine-building data center campus in Newton County, Georgia TPA Group, GA | Bisnow 2025-01-17 | Metric Name: N/A MWh | Square Feet Area: 2565000 Square Feet | Read more, TPA Group plans $5 billion, nine-building data center campus in Newton County, Georgia |
Data Center Projects | STACK Infrastructure announces 1+GW Stafford Technology Campus in Stafford County, Virginia STACK Infrastructure, VA | STACK Infrastructure 2025-01-16 | Metric Name: 1100 MWh | Square Feet Area: N/A Square Feet | Read more, STACK Infrastructure announces 1+GW Stafford Technology Campus in Stafford County, Virginia |
Data Center Projects | PowerHouse Data Centers and Poe Companies partner to develop Kentucky's first hyperscale data center campus in Louisville Power House Data Centers, KY | PR news wire 2025-01-16 | Metric Name: 400 MWh | Square Feet Area: 1800000 Square Feet | Read more, PowerHouse Data Centers and Poe Companies partner to develop Kentucky's first hyperscale data center campus in Louisville |
Data Center Projects | Meta plans $800 million expansion of Los Lunas data center campus with two new buildings Facebook, NM | News-Bulletin 2025-01-16 | Metric Name: N/A MWh | Square Feet Area: 750000 Square Feet | Read more, Meta plans $800 million expansion of Los Lunas data center campus with two new buildings |
Data Center Projects | JLL arranges over $1.2 billion in construction financing for The BlackChamber Group's data center projects in Northern Virginia Black Chamber, VA | PR news wire 2025-01-16 | Metric Name: 740 MWh | Square Feet Area: N/A Square Feet | Read more, JLL arranges over $1.2 billion in construction financing for The BlackChamber Group's data center projects in Northern Virginia |
Data Center Projects | Eagan Planning Commission approves data center on former YMCA property CLOP Eagan MN LLC, MN | Hometown Source 2025-01-10 | Metric Name: 5 MWh | Square Feet Area: 61500 Square Feet | Read more, Eagan Planning Commission approves data center on former YMCA property |
Data Center Projects | Prime Data Centers plans 130,000 sq ft expansion at McClellan Business Park in Sacramento, California Prime Data Center, CA | Bisjournal 2025-01-10 | Metric Name: 18 MWh | Square Feet Area: 110000 Square Feet | Read more, Prime Data Centers plans 130,000 sq ft expansion at McClellan Business Park in Sacramento, California |
Data Center Projects | Proposed data center in South Fort Worth sparks debate among city officials and residents Black Mountain, TX | Fort Worth Star-Telegram 2025-01-10 | Metric Name: N/A MWh | Square Feet Area: N/A Square Feet | Read more, Proposed data center in South Fort Worth sparks debate among city officials and residents |
Data Center Projects | PowerHouse and Provident partner on data center campus in Texas Power House Data Centers, GA | BisNow 2025-01-09 | Metric Name: 1800 MWh | Square Feet Area: N/A Square Feet | Read more, PowerHouse and Provident partner on data center campus in Texas |
Data Center Projects | Iron Mountain proposes 165,428 sq ft expansion to Manassas data center campus Iron Mountain, VA | U.S. Army Corps of Engineers Norfolk District 2025-01-09 | Metric Name: N/A MWh | Square Feet Area: 165428 Square Feet | Read more, Iron Mountain proposes 165,428 sq ft expansion to Manassas data center campus |
Manufacturing Projects | Hyundai plans a $6 billion steel mill in Ascension Parish, Louisiana, creating approximately 1,300 jobs Hyundai, LA | neworleanscitybusiness 2025-01-09 | Value: 7 USD - Billions | Square Feet Area: N/A Square Feet | Read more, Hyundai plans a $6 billion steel mill in Ascension Parish, Louisiana, creating approximately 1,300 jobs |
Data Center Projects | Trump and Hussain Sajwani announce $20 billion DAMAC data center investment in the U.S. Edgenex Data Center by DAMAC, OH | CNBC 2025-01-08 | Metric Name: N/A MWh | Square Feet Area: N/A Square Feet | Read more, Trump and Hussain Sajwani announce $20 billion DAMAC data center investment in the U.S. |
Data Center Projects | Lincoln Property Management, Gigabit Fiber, and Tradition Holdings collaborate on 131-acre data center campus in Red Oak, Texas Lincoln Property Management, TX | Lincoln 2025-01-08 | Metric Name: 384 MWh | Square Feet Area: 800000 Square Feet | Read more, Lincoln Property Management, Gigabit Fiber, and Tradition Holdings collaborate on 131-acre data center campus in Red Oak, Texas |
Data Center Projects | Tract proposes 447-acre data center park in Rosemount, Minnesota Tract, MN | BizJournals 2025-01-08 | Metric Name: N/A MWh | Square Feet Area: 2300000 Square Feet | Read more, Tract proposes 447-acre data center park in Rosemount, Minnesota |
Data Center Projects | Balico LLC's proposed 700-acre data center campus in Pittsylvania County, Virginia, faces recommendation for refusal Balico LLC, VA | Danville Register 2025-01-08 | Metric Name: 300 MWh | Square Feet Area: N/A Square Feet | Read more, Balico LLC's proposed 700-acre data center campus in Pittsylvania County, Virginia, faces recommendation for refusal |
Data Center Projects | AWS to invest $11 billion in Georgia for AI and cloud infrastructure expansion Amazon AWS, GA | AWS 2025-01-08 | Metric Name: N/A MWh | Square Feet Area: N/A Square Feet | Read more, AWS to invest $11 billion in Georgia for AI and cloud infrastructure expansion |
Data Center Projects | AWS to invest $11 billion in Georgia for AI and cloud infrastructure expansion Amazon AWS, GA | AWS 2025-01-08 | Metric Name: N/A MWh | Square Feet Area: N/A Square Feet | Read more, AWS to invest $11 billion in Georgia for AI and cloud infrastructure expansion |
Data Center Projects | Cloverleaf plans a 2,000-acre data center complex in Port Washington, Wisconsin Cloverleaf Infrastructure, WI | Ozaukeepress 2025-01-07 | Metric Name: 1000 MWh | Square Feet Area: N/A Square Feet | Read more, Cloverleaf plans a 2,000-acre data center complex in Port Washington, Wisconsin |
Data Center Projects | Proposed 4.9 million sq ft data center campus near Newnan Undisclosed Company, GA | The Atlanta Journal-Constitution 2025-01-03 | Metric Name: 932 MWh | Square Feet Area: 4900000 Square Feet | Read more, Proposed 4.9 million sq ft data center campus near Newnan |
Data Center Projects | Duos Technologies partners with Pampa, Texas, for high-density data center development Duos Technologies, TX | Duos Edge AI 2024-12-19 | Metric Name: 200 MWh | Square Feet Area: N/A Square Feet | Read more, Duos Technologies partners with Pampa, Texas, for high-density data center development |
Data Center Projects | Microsoft and QTS to develop over 1 million sq ft of data centers in Irving Microsoft, TX | BisNow 2024-12-18 | Metric Name: N/A MWh | Square Feet Area: 1000000 Square Feet | Read more, Microsoft and QTS to develop over 1 million sq ft of data centers in Irving |
Data Center Projects | Data center planned for 114 acres behind Coosa High School in Rome, Georgia Undisclosed Company, GA | RFDA 2024-12-17 | Metric Name: N/A MWh | Square Feet Area: N/A Square Feet | Read more, Data center planned for 114 acres behind Coosa High School in Rome, Georgia |
Data Center Projects | $12 billion Louisiana AI data center project by Hut 8 Hut8, LA | BusinessReport 2024-12-16 | Metric Name: 300 MWh | Square Feet Area: N/A Square Feet | Read more, $12 billion Louisiana AI data center project by Hut 8 |
Data Center Projects | Amazon commits additional $10B to Ohio data centers by 2030 Amazon AWS, OH | The Columbus Dispatch 2024-12-16 | Metric Name: N/A MWh | Square Feet Area: N/A Square Feet | Read more, Amazon commits additional $10B to Ohio data centers by 2030 |
Data Center Projects | TECfusions plans data center at former Arconic site in Upper Burrell, Pennsylvania TECfusions, PA | Triblive 2024-12-13 | Metric Name: 3000 MWh | Square Feet Area: 500000 Square Feet | Read more, TECfusions plans data center at former Arconic site in Upper Burrell, Pennsylvania |
Data Center Projects | AVAIO Digital to build $3B sustainable data center campus in Virginia AVAIO Digital, VA | AVAIO Digital 2024-12-10 | Metric Name: 300 MWh | Square Feet Area: N/A Square Feet | Read more, AVAIO Digital to build $3B sustainable data center campus in Virginia |
Data Center Projects | AVAIO Digital's 92 MW Pittsburg Technology Park data center project approved AVAIO Digital, CA | AVAIO Digital 2024-12-10 | Metric Name: 92 MWh | Square Feet Area: N/A Square Feet | Read more, AVAIO Digital's 92 MW Pittsburg Technology Park data center project approved |
Data Center Projects | Proposed 1.9 million sq ft data center campus near Atlanta Undisclosed Company, GA | BisNow 2024-12-09 | Metric Name: N/A MWh | Metric Name: 1902000 Square Feet | Read more, Proposed 1.9 million sq ft data center campus near Atlanta |
Data Center Projects | Cumberland County's first Data Center Campus proposed Power House Data Centers, PA | Pennlive 2024-12-09 | Metric Name: N/A MWh | Square Feet Area: 5000000 Square Feet | Read more, Cumberland County's first Data Center Campus proposed |
Infrastructure Projects | Evelution Energy U.S. cobalt processing facility EVelution, AZ | einnews 2024-12-03 | Value: 200 USD - Millions | Square Feet Area: N/A Square Feet | Read more, Evelution Energy U.S. cobalt processing facility |
Crypto Mining Project | Cipher Mining acquires new site in West Texas, adding 100 MW capacity Cipher Mining, TX | einnews 2024-11-26 | Power Comsumption: 100 MWh | Square Feet Area: N/A Square Feet | Read more, Cipher Mining acquires new site in West Texas, adding 100 MW capacity |
Data Center Projects | DataPrana plans to co-develop first 1.5GW AI data center in Texas Dataprana, TX | einnews 2024-11-26 | Power Comsumption: 1500 MWh | Square Feet Area: N/A Square Feet | Read more, DataPrana plans to co-develop first 1.5GW AI data center in Texas |
Data Center Projects | Stream files for 1.3 million sq ft data center campus outside Atlanta Stream Data Centers, GA | Georgia Department of Community Affairs 2024-11-25 | Power Comsumption: 240 MWh | Square Feet Area: 1300000 Square Feet | Read more, Stream files for 1.3 million sq ft data center campus outside Atlanta |
Data Center Projects | Colovore to build 20MW data center in Reno NV META, IN | Wishtv 2024-11-25 | Power Comsumption: N/A MWh | Square Feet Area: N/A Square Feet | Read more, Colovore to build 20MW data center in Reno NV |
Data Center Projects | CleanArc to develop 600MW data center in Caroline County, Virginia CleanArc, VA | ClearArc 2024-11-21 | Power Comsumption: 600 MWh | Square Feet Area: 1500000 Square Feet | Read more, CleanArc to develop 600MW data center in Caroline County, Virginia |
Data Center Projects | Cologix expands in Central Ohio with new 800MW data center Cologix, OH | Cologix 2024-11-20 | Power Comsumption: 800 MWh | Square Feet Area: 2000000 Square Feet | Read more, Cologix expands in Central Ohio with new 800MW data center |
Data Center Projects | Denton approves $6.1 billion bitcoin mining to AI data center conversion Core Scientific, TX | Core Scientific 2024-11-20 | Metric Name: 394 MWh | Square Feet Area: N/A Square Feet | Read more, Denton approves $6.1 billion bitcoin mining to AI data center conversion |
Data Center Projects | Cologix buys land in Ohio for 800MW data center campus Cologix, OH | Cologix 2024-11-20 | Power Comsumption: 800 MWh | Square Feet Area: 2000000 Square Feet | Read more, Cologix buys land in Ohio for 800MW data center campus |
Data Center Projects | Meta plans $5B AI data center in Louisiana META, LA | Shreveport Times 2024-11-19 | Power Comsumption: N/A MWh | Square Feet Area: N/A Square Feet | Read more, Meta plans $5B AI data center in Louisiana |
Data Center Projects | Iron Mountain expands data center capacity in Manassas by 150+ MW Iron Mountain, VA | Iron Mountain 2024-11-18 | Power Comsumption: 150 MWh | Square Feet Area: 1085000 Square Feet | Read more, Iron Mountain expands data center capacity in Manassas by 150+ MW |
Data Center Projects | Iron Mountain expands data center capacity in Virginia by 200+ MW Iron Mountain, VA | Iron Mountain 2024-11-18 | Power Comsumption: 200 MWh | Square Feet Area: 800000 Square Feet | Read more, Iron Mountain expands data center capacity in Virginia by 200+ MW |
Data Center Projects | Colovore to build 20MW data center in Reno NV Colovore, NV | Colovore 2024-11-14 | Power Comsumption: 9 MWh | Square Feet Area: 100000 Square Feet | Read more, Colovore to build 20MW data center in Reno NV |
Data Center Projects | DC BLOX developing a hyperscale edge node data center in Montgomery, Alabama DC Blox, AL | DC Blox 2024-11-14 | Power Comsumption: 40 MWh | Square Feet Area: N/A Square Feet | Read more, DC BLOX developing a hyperscale edge node data center in Montgomery, Alabama |
Data Center Projects | PG&E plans 200MW San Jose data center campus PG&E, CA | PR news wire 2024-11-14 | Power Comsumption: 200 MWh | Square Feet Area: N/A Square Feet | Read more, PG&E plans 200MW San Jose data center campus |
Data Center Projects | DataPrana breaks ground on new 30 MW data center site in La Marque, Texas Dataprana, TX | einnews 2024-11-11 | Power Comsumption: 30 MWh | Square Feet Area: N/A Square Feet | Read more, DataPrana breaks ground on new 30 MW data center site in La Marque, Texas |
Data Center Projects | CyrusOne to build data center outside DFW, Texas CyrusOne, TX | Texas Department of Licensing and Regulation 2024-11-11 | Power Comsumption: N/A MWh | Square Feet Area: 250000 Square Feet | Read more, CyrusOne to build data center outside DFW, Texas |
Data Center Projects | AWS plans $2 billion data center campus in Sunbury, Ohio Amazon AWS, OH | Yahoo 2024-11-11 | Power Comsumption: N/A MWh | Square Feet Area: 450000 Square Feet | Read more, AWS plans $2 billion data center campus in Sunbury, Ohio |
Data Center Projects | Vantage breaks ground on 192MW data center in Ohio Vantage, OH | Vantage 2024-10-25 | Power Comsumption: 192 MWh | Square Feet Area: 1500000 Square Feet | Read more, Vantage breaks ground on 192MW data center in Ohio |
Data Center Projects | Google, $3.3 billion investment, Berkeley and Dorchester counties, SC. Google, SC | ABC4News 2024-10-07 | Power Comsumption: N/A MWh | Square Feet Area: N/A Square Feet | Read more, Google, $3.3 billion investment, Berkeley and Dorchester counties, SC. |
Infrastructure Projects | Microsoft and Constellation deal for nuclear power for 835MW Constellation Energy, PA | Washington Post 2024-09-20 | Power Comsumption: 835 MWh | Square Feet Area: N/A Square Feet | Read more, Microsoft and Constellation deal for nuclear power for 835MW |
Data Center Projects | Bitdeer reports an update on their Massillon, Ohio - 221 MW site is also making progress: "Building design is completed, and construction is anticipated to begin in Q4 2024, earlier than expected." Company Not Disclosed, OH | Bitdeer 2024-09-15 | Power Comsumption: 221 MWh | Square Feet Area: N/A Square Feet | Read more, Bitdeer reports an update on their Massillon, Ohio - 221 MW site is also making progress: "Building design is completed, and construction is anticipated to begin in Q4 2024, earlier than expected." |
Data Center Projects | T5 Finalizes Land Acquisition in Atlanta to Support a 300 MW Data Center T5 Data Centers, GA | PR news wire 2024-08-28 | Power Comsumption: 300 MWh | Square Feet Area: 1600000 Square Feet | Read more, T5 Finalizes Land Acquisition in Atlanta to Support a 300 MW Data Center |
Data Center Projects | Tract Closes Acquisition of 2,069 acres in Buckeye Tract, AZ | Globalnewswire 2024-08-26 | Power Comsumption: 1800 MWh | Square Feet Area: 20000000 Square Feet | Read more, Tract Closes Acquisition of 2,069 acres in Buckeye |
Commercial Projects | Amazon will build a new facility at Kennedy Space Center in Florida Amazon AWS, FL | Executivebiz 2024-08-23 | Value: N/A USD - Millions | Read more, Amazon will build a new facility at Kennedy Space Center in Florida | |
Housing Projects | BlackRock Buys Wayland Senior Housing Community For $98M BlackRock, MA | Biznow 2024-08-23 | Value: 98 USD - Millions | Read more, BlackRock Buys Wayland Senior Housing Community For $98M | |
Housing Projects | Century Communities Announces Groundbreaking Event 80 New Homes near San Antonio Century Communities, TX | Yahoo 2024-08-23 | Value: N/A USD - Millions | Read more, Century Communities Announces Groundbreaking Event 80 New Homes near San Antonio | |
Data Center Projects | Novva Data Centersplans to build a 300MW data center campus on 160 acres outside Mesa AZ Novva, AZ | Novva 2024-08-21 | Power Comsumption: 300 MWh | Square Feet Area: 1300000 Square Feet | Read more, Novva Data Centersplans to build a 300MW data center campus on 160 acres outside Mesa AZ |
Infrastructure Projects | Texas Instruments awarded $1.6bn in US CHIPS funding for Texas Factory Texas instruments, TX | The Hill 2024-08-16 | Value: 1.6 USD - Billions | Location: N/A Square Feet | Read more, Texas Instruments awarded $1.6bn in US CHIPS funding for Texas Factory |
Data Center Projects | TierPoint Acquires Downtown St. Louis Building for Newest Data Center TierPoint, MO | Globalnewswire 2024-08-13 | Power Comsumption: 5 MWh | Square Feet Area: 22600 Square Feet | Read more, TierPoint Acquires Downtown St. Louis Building for Newest Data Center |
Data Center Projects | Vantage Data Centers filed for a 750k sq ft campus in Westlake, GA Vantage, GA | Georgia Department of Community Affairs 2024-08-13 | Power Comsumption: N/A MWh | Square Feet Area: 754000 Square Feet | Read more, Vantage Data Centers filed for a 750k sq ft campus in Westlake, GA |
Infrastructure Projects | Dominion Energy installs the 50th monopile foundation for the Coastal Virginia Offshore Wind project Dominion , VA | PR news wire 2024-08-12 | Power Comsumption: 2600 MWh | Square Feet Area: N/A Square Feet | Read more, Dominion Energy installs the 50th monopile foundation for the Coastal Virginia Offshore Wind project |
Data Center Projects | Thor Equities has acquired a 270-acre parcel in LaGrange, Georgia, for a data center development Thor Equities, GA | Globalnewswire 2024-08-09 | Power Comsumption: 50 MWh | Square Feet Area: 506000 Square Feet | Read more, Thor Equities has acquired a 270-acre parcel in LaGrange, Georgia, for a data center development |
Infrastructure Projects | SK Hynix new $3.87bn HBM plant in West Lafayette, Indiana SK Hynix, IN | Bloomberg 2024-08-06 | Value: 3.87 USD - Billions | Square Feet Area: N/A Square Feet | Read more, SK Hynix new $3.87bn HBM plant in West Lafayette, Indiana |
Data Center Projects | CalEthos buys 315 acres for Lithium Valley data center CalEthos, CA | CalEthos 2024-08-01 | Power Comsumption: 420 MWh | Square Feet Area: 3400000 Square Feet | Read more, CalEthos buys 315 acres for Lithium Valley data center |
Infrastructure Projects | Kairos Power Begins Construction on Hermes Low-Power Demonstration Reactor Kairos Power, TN | EINPresswire 2024-07-30 | Value: 100 USD - Millions | Read more, Kairos Power Begins Construction on Hermes Low-Power Demonstration Reactor | |
Infrastructure Projects | Amkor receives $400M for Arizona chip facility Amkor, AZ | NIST 2024-07-26 | Value: 400 USD - Millions | Square Feet Area: N/A Square Feet | Read more, Amkor receives $400M for Arizona chip facility |
Data Center Projects | DataBank announced that it has now begun construction of its third data center on Red Rum Drive in Ashburn, VA DATABANK, VA | Databank 2024-07-25 | Power Comsumption: 20 MWh | Square Feet Area: 70000 Square Feet | Read more, DataBank announced that it has now begun construction of its third data center on Red Rum Drive in Ashburn, VA |
Commercial Projects | US Specialty Formulations Announces $15 Million Expansion to Modernize Biopharma Operations US Specialty Formulations, PA | EINPresswire 2024-07-24 | Value: 15 USD - Millions | Read more, US Specialty Formulations Announces $15 Million Expansion to Modernize Biopharma Operations | |
Data Center Projects | QTS to build 13 data centers outside Richmond QTS Data Centers, VA | Virginia Business 2024-07-23 | Power Comsumption: N/A MWh | Square Feet Area: N/A Square Feet | Read more, QTS to build 13 data centers outside Richmond |
Data Center Projects | xAI launches Memphis supercluster with Nvidia GPUs xAI, TN | X 2024-07-23 | Power Comsumption: 150 MWh | Square Feet Area: 670000 Square Feet | Read more, xAI launches Memphis supercluster with Nvidia GPUs |
Commercial Projects | Leitner-Poma of America Opens New Facility in Tooele, Utah, Set to Create More Than 120 Manufacturing Jobs None, UT | EINPresswire 2024-07-19 | Value: 27 USD - Millions | Read more, Leitner-Poma of America Opens New Facility in Tooele, Utah, Set to Create More Than 120 Manufacturing Jobs | |
Data Center Projects | TeraWulf gets approval for more data centers at Lake Mariner campus in New York TeraWulf, NY | TeraWulf 2024-07-19 | Power Comsumption: 70 MWh | Square Feet Area: 210000 Square Feet | Read more, TeraWulf gets approval for more data centers at Lake Mariner campus in New York |
Data Center Projects | PowerHouse breaks ground on 800MW data center campus in Virginia PowerHouse, VA | Powerhouse 2024-07-19 | Power Comsumption: 800 MWh | Square Feet Area: 3500000 Square Feet | Read more, PowerHouse breaks ground on 800MW data center campus in Virginia |
Data Center Projects | EdgeCore Digital Infrastructure to develop a 1.4 million square foot data center campus capable of initially supporting 216MW EDGECORE, VA | EdgeCore 2024-07-18 | Power Comsumption: 216 MWh | Square Feet Area: 1400000 Square Feet | Read more, EdgeCore Digital Infrastructure to develop a 1.4 million square foot data center campus capable of initially supporting 216MW |
Commercial Projects | QUASI ROBOTICS ANNOUNCES NEW HEADQUARTERS IN FREDERICK, MARYLAND BIOTECH CORRIDOR None, MD | EINPresswire 2024-07-17 | Value: N/A USD - Millions | Read more, QUASI ROBOTICS ANNOUNCES NEW HEADQUARTERS IN FREDERICK, MARYLAND BIOTECH CORRIDOR | |
Commercial Projects | NorthPoint Development Unveils Harbor Logistics Center, A New Industrial Hub in Baltimore NorthPoint Development, MD | EINPresswire 2024-07-16 | Value: 124 USD - Millions | Read more, NorthPoint Development Unveils Harbor Logistics Center, A New Industrial Hub in Baltimore | |
Data Center Projects | EdgeConneX, a global provider of data center solutions, announce today the joint development of a 324MW hyperscale data center campus in Atlanta, GA. EdgeConneX, GA | Businesswire 2024-07-16 | Power Comsumption: 324 MWh | Square Feet Area: N/A Square Feet | Read more, EdgeConneX, a global provider of data center solutions, announce today the joint development of a 324MW hyperscale data center campus in Atlanta, GA. |
Housing Projects | Azure Printed Homes and CR Investments Announce Collaboration to Establish New Manufacturing Plant in Bennett, CO Azure Printed Homes, CO | EINPresswire 2024-07-11 | Value: N/A USD - Millions | Read more, Azure Printed Homes and CR Investments Announce Collaboration to Establish New Manufacturing Plant in Bennett, CO | |
Data Center Projects | Texas Broker Holds Off-Market Listing for Land Adjacent to Google's Fourth Midlothian Texas Data Center None, TX | EINPresswire 2024-07-11 | Power Comsumption: N/A MWh | Square Feet Area: N/A Square Feet | Read more, Texas Broker Holds Off-Market Listing for Land Adjacent to Google's Fourth Midlothian Texas Data Center |
Infrastructure Projects | NSF invests $457M in Horizon supercomputer facility National Science Foundation, TX | datacenterdynamics 2024-07-10 | Value: 457 USD - Millions | Square Feet Area: N/A Square Feet | Read more, NSF invests $457M in Horizon supercomputer facility |
Infrastructure Projects | ENTEK Lithium Separators Receives Conditional Commitment from DOE for Indiana EV Battery Separator Manufacturing Plant ENTEK, IN | EINPresswire 2024-07-09 | Value: 1.2 USD - Billions | Read more, ENTEK Lithium Separators Receives Conditional Commitment from DOE for Indiana EV Battery Separator Manufacturing Plant | |
Commercial Projects | Boise Cascade Company Expands to Hondo, TX None, TX | EINPresswire 2024-07-09 | Value: N/A USD - Millions | Read more, Boise Cascade Company Expands to Hondo, TX | |
Housing Projects | New Miami Condominium Solana Bay Enjoys 290 Degree Waterfront Views Kolter Urban, FL | EINPresswire 2024-07-05 | Value: N/A USD - Millions | Read more, New Miami Condominium Solana Bay Enjoys 290 Degree Waterfront Views | |
Data Center Projects | Meta to develop a hyperscale data center in Cheyenne, Wyoming. META, WY | Facebook 2024-07-05 | Power Comsumption: N/A MWh | Square Feet Area: 715000 Square Feet | Read more, Meta to develop a hyperscale data center in Cheyenne, Wyoming. |
Data Center Projects | Google announced plans to invest another $1 billion in its data center in Council Bluffs. GOOGLE, IA | Google 2024-07-02 | Power Comsumption: N/A MWh | Square Feet Area: N/A Square Feet | Read more, Google announced plans to invest another $1 billion in its data center in Council Bluffs. |
Housing Projects | City of Waupaca & Tycore Built to Host Info Session for Recently Approved River North Ridge Housing Development Tycore Built, WI | EINPresswire 2024-07-02 | Value: N/A USD - Millions | Read more, City of Waupaca & Tycore Built to Host Info Session for Recently Approved River North Ridge Housing Development | |
Housing Projects | Ryko Development Celebrates Groundbreaking of Oakberry Trails in Waller, Texas Ryko Development, TX | EINPresswire 2024-07-02 | Value: N/A USD - Millions | Read more, Ryko Development Celebrates Groundbreaking of Oakberry Trails in Waller, Texas | |
Infrastructure Projects | RENEWABLE LAND ACQUIRES 622 ACRES OF LAND IN NEVADA Renewable Land, NV | EINPresswire 2024-07-01 | Value: N/A USD - Millions | Read more, RENEWABLE LAND ACQUIRES 622 ACRES OF LAND IN NEVADA | |
Data Center Projects | Stream Data Centers to build up to five new buildings, 200 MW, 1.5 million data center square feet. Stream Data Centers, TX | Stream Data Centers 2024-06-26 | Power Comsumption: 200 MWh | Square Feet Area: 1500000 Square Feet | Read more, Stream Data Centers to build up to five new buildings, 200 MW, 1.5 million data center square feet. |
Data Center Projects | Microsoft to build a six-data center campus on 200 acres west in Ohio Microsoft, OH | 10WBNS 2024-06-26 | Power Comsumption: N/A MWh | Square Feet Area: N/A Square Feet | Read more, Microsoft to build a six-data center campus on 200 acres west in Ohio |
Infrastructure Projects | Sussex Green Enterprise Park Aims to Ignite Economic Development in Sussex County None, VA | EINPresswire 2024-06-25 | Value: 250 USD - Millions | Read more, Sussex Green Enterprise Park Aims to Ignite Economic Development in Sussex County | |
Data Center Projects | Compass Datacenters announces the new data center campus located at the former Sears Headquarters, $10 billion of investment Compass Data Centers, IL | Businesswire 2024-06-19 | Power Comsumption: N/A MWh | Square Feet Area: N/A Square Feet | Read more, Compass Datacenters announces the new data center campus located at the former Sears Headquarters, $10 billion of investment |
Data Center Projects | 5C Data Centers ("5CDC"), plans to develop its next data center campus, CMH01, in the Columbus, Ohio 5C Data Centers, OH | PR news wire 2024-06-19 | Power Comsumption: 200 MWh | Square Feet Area: 320000 Square Feet | Read more, 5C Data Centers ("5CDC"), plans to develop its next data center campus, CMH01, in the Columbus, Ohio |
Housing Projects | SCDC Signs Contract on Baytown Location for the Construction of Cheerful Creek Court SCDC, TX | EINPresswire 2024-06-14 | Value: N/A USD - Millions | Read more, SCDC Signs Contract on Baytown Location for the Construction of Cheerful Creek Court | |
Housing Projects | Terra Development LLC Closes on Land Acquisition for Blakely Manor Construction-Ready Residential Lots Terra Development, GA | EINPresswire 2024-06-12 | Value: N/A USD - Millions | Read more, Terra Development LLC Closes on Land Acquisition for Blakely Manor Construction-Ready Residential Lots | |
Housing Projects | UC Berkeley, allowing for the construction of new student housing at People's Park. $312 million project None, CA | EINPresswire 2024-06-12 | Value: 312 USD - Millions | Read more, UC Berkeley, allowing for the construction of new student housing at People's Park. $312 million project | |
Data Center Projects | TerraPower begins construction at 345-MW advanced reactor site in Wyoming TerraPower, WY | UtilityDive 2024-06-12 | Power Comsumption: 345 MWh | Square Feet Area: N/A Square Feet | Read more, TerraPower begins construction at 345-MW advanced reactor site in Wyoming |
Housing Projects | Groundbreaking Ceremony for Ascent Apartments, an $80 Million Luxury Multi-Family Development in Kansas City NorthPoint Development, MO | EINPresswire 2024-06-11 | Value: 80 USD - Millions | Read more, Groundbreaking Ceremony for Ascent Apartments, an $80 Million Luxury Multi-Family Development in Kansas City | |
Housing Projects | VizConnect, Inc (OTC: VIZC) Announces Co-Developer Agreement w/ 338 Falmouth Foreside Company to Lead Presumpscot Woods VizConnect, ME | EINPresswire 2024-06-06 | Value: N/A USD - Millions | Read more, VizConnect, Inc (OTC: VIZC) Announces Co-Developer Agreement w/ 338 Falmouth Foreside Company to Lead Presumpscot Woods | |
Data Center Projects | DataNovaX Pioneer Park's Phase II will include a 550,000-square-feet facility with 150 MW of power DataNovaX, TX | DataNovaX 2024-06-05 | Power Comsumption: 150 MWh | Square Feet Area: 550000 Square Feet | Read more, DataNovaX Pioneer Park's Phase II will include a 550,000-square-feet facility with 150 MW of power |
Infrastructure Projects | State-of-the-Art Kennedy Space Center Launch Support Complex All Points Logistics, FL | EINPresswire 2024-05-28 | Value: N/A USD - Millions | Read more, State-of-the-Art Kennedy Space Center Launch Support Complex | |
Infrastructure Projects | J&B Solar Selected for 175 Megawatt Utility-Scale Solar Project in Michigan Roncelli, FL | EINPresswire 2024-05-28 | Value: N/A USD - Millions | Read more, J&B Solar Selected for 175 Megawatt Utility-Scale Solar Project in Michigan | |
Housing Projects | Scott Whittaker & Latigo Group breaks ground on a second multi-housing development in Southwest Florida. Latigo Group, FL | EINPresswire 2024-05-27 | Value: 192 USD - Millions | Read more, Scott Whittaker & Latigo Group breaks ground on a second multi-housing development in Southwest Florida. | |
Commercial Projects | North American Air Exchanger Announces New Facility and Partnership with SME and Bosetech North American Air Exchanger, OK | EINPresswire 2024-05-23 | Value: N/A USD - Millions | Read more, North American Air Exchanger Announces New Facility and Partnership with SME and Bosetech | |
Commercial Projects | Eastman Cooke Begins Build out of Diagnostic & Treatment Clinic in the Bronx Eastman Cooke, NY | EINPresswire 2024-05-22 | Value: N/A USD - Millions | Read more, Eastman Cooke Begins Build out of Diagnostic & Treatment Clinic in the Bronx | |
Infrastructure Projects | ACCIONA ENERGÍA STARTS OPERATING ITS LARGEST PV PLANT, RED TAILED HAWK, IN TEXAS ACCIONA ENERGÍA, TX | EINPresswire 2024-05-22 | Value: N/A USD - Millions | Read more, ACCIONA ENERGÍA STARTS OPERATING ITS LARGEST PV PLANT, RED TAILED HAWK, IN TEXAS | |
Housing Projects | Kindred Homes Unveils Newest Community, Westside Preserve, in Midlothian, Texas Kindred Homes, TX | EINPresswire 2024-05-21 | Value: N/A USD - Millions | Read more, Kindred Homes Unveils Newest Community, Westside Preserve, in Midlothian, Texas | |
Housing Projects | Olerio Homes Unveils East Love Townhomes in Dallas, Texas Olerio Homes, TX | EINPresswire 2024-05-21 | Value: N/A USD - Millions | Read more, Olerio Homes Unveils East Love Townhomes in Dallas, Texas | |
Infrastructure Projects | TJPA CELEBRATES $3.4 BILLION FEDERAL COMMITMENT FOR THE PORTAL: Project advances to Engineering Phase None, CA | EINPresswire 2024-05-21 | Value: 3.4 USD - Billions | Read more, TJPA CELEBRATES $3.4 BILLION FEDERAL COMMITMENT FOR THE PORTAL: Project advances to Engineering Phase | |
Data Center Projects | Crusoe is building a 200 MW data center at the Lancium Clean Campus outised Abilene, Texas Crusoe, TX | Crusoe 2024-05-18 | Power Comsumption: 200 MWh | Square Feet Area: N/A Square Feet | Read more, Crusoe is building a 200 MW data center at the Lancium Clean Campus outised Abilene, Texas |
Housing Projects | The Benison ATL: Pioneering Stonecrest's First Mini-Home Community on New Birth’s Campus Sydney A. Capital Partners, GA | EINPresswire 2024-05-17 | Value: N/A USD - Millions | Read more, The Benison ATL: Pioneering Stonecrest's First Mini-Home Community on New Birth’s Campus | |
Commercial Projects | Syracuse University, Onondaga County Make Combined $20M Investment to Launch Advanced Semiconductor Manufacturing Center None, NY | EINPresswire 2024-05-16 | Value: 20 USD - Millions | Read more, Syracuse University, Onondaga County Make Combined $20M Investment to Launch Advanced Semiconductor Manufacturing Center | |
Housing Projects | Oxland Group announces Phase One Delivery of Homesites at Two Step Farm Two Step Farm will include 1,100 homesites Oxland Group, TX | EINPresswire 2024-05-16 | Value: N/A USD - Millions | Read more, Oxland Group announces Phase One Delivery of Homesites at Two Step Farm Two Step Farm will include 1,100 homesites | |
Commercial Projects | Small Warehouses, the New Big Thing in Commercial Real Estate Garage For Life, SC | EINPresswire 2024-05-16 | Value: N/A USD - Millions | Read more, Small Warehouses, the New Big Thing in Commercial Real Estate | |
Data Center Projects | Meta Expands Data Center Footprint with $800 Million Investment in Montgomery, Alabama META, AL | Made in Alabama 2024-05-07 | Power Comsumption: N/A MWh | Square Feet Area: 715000 Square Feet | Read more, Meta Expands Data Center Footprint with $800 Million Investment in Montgomery, Alabama |
Commercial Projects | Intel's Massive $28B ""Ohio One"" Mega-Fab - A Potential Semiconductor Powerhouse INTEL, OH | Bloomberg 2024-05-06 | Value: 28 USD - Billions | Read more, Intel's Massive $28B ""Ohio One"" Mega-Fab - A Potential Semiconductor Powerhouse | |
Data Center Projects | Tract Breaks Ground on Peru Shelf Technology Park in Storey County, Nevada TRACT, NV | GlobeNewswire 2024-04-30 | Power Comsumption: 810 MWh | Square Feet Area: N/A Square Feet | Read more, Tract Breaks Ground on Peru Shelf Technology Park in Storey County, Nevada |
Commercial Projects | Semiconductor Surge: $6.1 Billion Boost Ignites Economic Revival in Upstate New York MICRON, NY | NPR 2024-04-29 | Value: 6.1 USD - Billions | Read more, Semiconductor Surge: $6.1 Billion Boost Ignites Economic Revival in Upstate New York | |
Data Center Projects | AWS plans to invest $11 billion in Indiana, will build new data centers in St. Joseph County Amazon AWS, IN | Amazon 2024-04-25 | Power Comsumption: N/A MWh | Square Feet Area: N/A Square Feet | Read more, AWS plans to invest $11 billion in Indiana, will build new data centers in St. Joseph County |
Manufacturing Projects | Samsung invests $17 billion in new semiconductor manufacturing facility in Taylor, Texas Samsung, TX | Samsung 2024-04-15 | Metric Name: N/A MWh | Square Feet Area: 2700000 Square Feet | Read more, Samsung invests $17 billion in new semiconductor manufacturing facility in Taylor, Texas |
Manufacturing Projects | TSMC is currently building three semiconductor fabrication plants in Phoenix, Arizona, representing a total investment of over $65 billion TSMC, AZ | TSMC 2024-04-08 | Metric Name: N/A MWh | Square Feet Area: N/A Square Feet | Read more, TSMC is currently building three semiconductor fabrication plants in Phoenix, Arizona, representing a total investment of over $65 billion |
Commercial Projects | Arizona's Semiconductor Boom: Taiwan Semiconductor Manufacturing's Monumental Investment TSMC, AZ | tsmc 2024-04-08 | Value: 6 USD - Billions | Read more, Arizona's Semiconductor Boom: Taiwan Semiconductor Manufacturing's Monumental Investment | |
Data Center Projects | Vantage Data Centers proposes a 618-acre data center campus in Pittsboro, Indiana Vantage Data Centers, IN | WRTV 2024-02-11 | Power Comsumption: 432 MWh | Square Feet Area: N/A Square Feet | Read more, Vantage Data Centers proposes a 618-acre data center campus in Pittsboro, Indiana |
Housing Projects | Transforming D.C. Office Space into High-End Executive Apartments: Mint House and Altus Realty's Innovative Venture Altus, DC | CoStar 2024-02-08 | Value: 30 USD - Millions | Read more, Transforming D.C. Office Space into High-End Executive Apartments: Mint House and Altus Realty's Innovative Venture | |
Commercial Projects | SK Hynix Poised to Boost U.S. Semiconductor Industry with Potential $15 Billion Investment in Indiana SK Hynix, IN | Fortune 2024-02-02 | Value: 15 USD - Billions | Read more, SK Hynix Poised to Boost U.S. Semiconductor Industry with Potential $15 Billion Investment in Indiana | |
Data Center Projects | Amazon to invest $10B in 2 Mississippi data centers Amazon AWS, MS | Construction Dive 2024-01-31 | Value: 10 USD - Billions | Read more, Amazon to invest $10B in 2 Mississippi data centers | |
Data Center Projects | Mississippi's Major Investment: Incentives for Amazon Data Centers Set to Boost Jobs and Infrastructure Amazon AWS, MS | Insurance Journal 2024-01-30 | Power Comsumption: N/A MWh | Square Feet Area: N/A Square Feet | Read more, Mississippi's Major Investment: Incentives for Amazon Data Centers Set to Boost Jobs and Infrastructure |
Commercial Projects | Biden Administration's $162 Million Funding Boosts Microchip Technology in Colorado and Oregon Microchip, CO | U.S News 2024-01-29 | Value: 162 USD - Millions | Read more, Biden Administration's $162 Million Funding Boosts Microchip Technology in Colorado and Oregon | |
Infrastructure Projects | Raleigh's BRT Line Development: A Catalyst for Urban Growth and Redevelopment None, NC | Transit Talent 2024-01-25 | Value: N/A USD - Millions | Read more, Raleigh's BRT Line Development: A Catalyst for Urban Growth and Redevelopment | |
Infrastructure Projects | Key Milestones in South Dakota's Prison Construction Project None, SD | Nebraska Examiner 2024-01-24 | Value: 390 USD - Millions | Read more, Key Milestones in South Dakota's Prison Construction Project | |
Manufacturing Projects | Tesla initiates $3.6 billion expansion of Gigafactory Nevada to produce Semi trucks and 4680 battery cells Tesla, NV | TESLARATI 2024-01-19 | Metric Name: N/A MWh | Square Feet Area: 4000000 Square Feet | Read more, Tesla initiates $3.6 billion expansion of Gigafactory Nevada to produce Semi trucks and 4680 battery cells |
Data Center Projects | DataBank announced another expansion of its SLC6 data center in Salt Lake City DATABANK, UT | Databank 2024-01-10 | Power Comsumption: 5 MWh | Square Feet Area: 25000 Square Feet | Read more, DataBank announced another expansion of its SLC6 data center in Salt Lake City |
Data Center Projects | Compass Datacenters plans $10 billion, 500MW data center campus in Meridian, Mississippi Compass Data Centers, MS | Magnolia Tribune 2024-01-09 | Metric Name: 500 MWh | Square Feet Area: N/A Square Feet | Read more, Compass Datacenters plans $10 billion, 500MW data center campus in Meridian, Mississippi |
Housing Projects | San Diego County awards $42 million to 9 affordable housing developments None, CA | City News Service 2024-01-03 | Value: 42 USD - Millions | Read more, San Diego County awards $42 million to 9 affordable housing developments | |
Commercial Projects | Costco store, 18-pump gas station, stores, restaurants and 378 apartments opening its doors in spring 2025, Stuart FL 34994 COSTCO, FL | TC Palm 2023-12-22 | Value: N/A USD - Millions | Read more, Costco store, 18-pump gas station, stores, restaurants and 378 apartments opening its doors in spring 2025, Stuart FL 34994 | |
Commercial Projects | Intel's $20 Billion Semiconductor Factory in New Albany, Ohio INTEL, OH | Spectrum News 1 2023-12-14 | Value: 20 USD - Billions | Read more, Intel's $20 Billion Semiconductor Factory in New Albany, Ohio | |
Housing Projects | Westview Heights Affordable-Housing Project, 76201, Denton, Texas Generation Housing Partners, TX | Commercial Real Estate Direct 2023-12-12 | Value: N/A USD - Millions | Read more, Westview Heights Affordable-Housing Project, 76201, Denton, Texas | |
Housing Projects | Jackson City Council Approves $12 Million Housing Development in Midtown Jackson City, MS, 39202 Gulf Coast Housing, MS | WLBT3 2023-12-04 | Value: 12 USD - Millions | Read more, Jackson City Council Approves $12 Million Housing Development in Midtown Jackson City, MS, 39202 | |
Commercial Projects | $200 million development. The new three-story, 150,000-square-foot complex will employ a NVIDIA supercomputer NVIDIA, OR | Oregon State U 2023-11-28 | Value: 200 USD - Millions | Read more, $200 million development. The new three-story, 150,000-square-foot complex will employ a NVIDIA supercomputer | |
Manufacturing Projects | Hyundai and LG invest $2 billion in EV battery plant in Bryan County, Georgia Hyundai, GA | electrek 2023-11-04 | Metric Name: 30 MWh | Square Feet Area: N/A Square Feet | Read more, Hyundai and LG invest $2 billion in EV battery plant in Bryan County, Georgia |
Manufacturing Projects | Panasonic constructs 4.7 million sq ft EV battery plant in De Soto, Kansas, aiming for 2025 production start Panasonic, KS | Panasonic 2022-11-02 | Metric Name: N/A MWh | Square Feet Area: 4700000 Square Feet | Read more, Panasonic constructs 4.7 million sq ft EV battery plant in De Soto, Kansas, aiming for 2025 production start |
Manufacturing Projects | LG Energy Solution and Honda collaborate on a $4.4 billion EV battery plant in Jeffersonville, Ohio Honda, OH | LG 2022-10-11 | Metric Name: N/A MWh | Square Feet Area: 2000000 Square Feet | Read more, LG Energy Solution and Honda collaborate on a $4.4 billion EV battery plant in Jeffersonville, Ohio |
Manufacturing Projects | Ford invests $11.4 billion in BlueOval City and BlueOval SK Battery Park to lead U.S. EV revolution Ford, KY | Ford 2021-09-27 | Power Comsumption: 43000 MWh | Square Feet Area: N/A Square Feet | Read more, Ford invests $11.4 billion in BlueOval City and BlueOval SK Battery Park to lead U.S. EV revolution |
Manufacturing Projects | Ford invests $11.4 billion in BlueOval City and BlueOval SK Battery Park to lead U.S. EV revolution Ford, KY | Ford 2021-09-27 | Metric Name: 43000 MWh | Square Feet Area: N/A Square Feet | Read more, Ford invests $11.4 billion in BlueOval City and BlueOval SK Battery Park to lead U.S. EV revolution |
Manufacturing Projects | Ford invests $11.4 billion in BlueOval City and BlueOval SK Battery Park to lead U.S. EV revolution Ford, KY | Ford 2021-09-27 | Power Comsumption: 43000 MWh | Square Feet Area: N/A Square Feet | Read more, Ford invests $11.4 billion in BlueOval City and BlueOval SK Battery Park to lead U.S. EV revolution |
Manufacturing Projects | Ford invests $11.4 billion in BlueOval City and BlueOval SK Battery Park to lead U.S. EV revolution Ford, KY | Ford 2021-09-27 | Metric Name: 43000 MWh | Square Feet Area: N/A Square Feet | Read more, Ford invests $11.4 billion in BlueOval City and BlueOval SK Battery Park to lead U.S. EV revolution |
Manufacturing Projects | Ford invests $11.4 billion in BlueOval City and BlueOval SK Battery Park to lead U.S. EV revolution Ford, KY | Ford 2021-09-27 | Power Comsumption: 43000 MWh | Square Feet Area: N/A Square Feet | Read more, Ford invests $11.4 billion in BlueOval City and BlueOval SK Battery Park to lead U.S. EV revolution |
Manufacturing Projects | Ford invests $11.4 billion in BlueOval City and BlueOval SK Battery Park to lead U.S. EV revolution Ford, KY | Ford 2021-09-27 | Metric Name: 43000 MWh | Square Feet Area: N/A Square Feet | Read more, Ford invests $11.4 billion in BlueOval City and BlueOval SK Battery Park to lead U.S. EV revolution |
Manufacturing Projects | Ford invests $11.4 billion in BlueOval City and BlueOval SK Battery Park to lead U.S. EV revolution Ford, KY | Ford 2021-09-27 | Metric Name: 43000 MWh | Square Feet Area: N/A Square Feet | Read more, Ford invests $11.4 billion in BlueOval City and BlueOval SK Battery Park to lead U.S. EV revolution |
Manufacturing Projects | Ford invests $11.4 billion in BlueOval City and BlueOval SK Battery Park to lead U.S. EV revolution Ford, KY | Ford 2021-09-27 | Metric Name: 43000 MWh | Square Feet Area: N/A Square Feet | Read more, Ford invests $11.4 billion in BlueOval City and BlueOval SK Battery Park to lead U.S. EV revolution |